Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | a89 |
Date time: | 1.12pm, Saturday 28th April, 2012 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | West Lothian |
Another A89 junction with no thought put into how cyclepath should cross it - see #37335
Comments reflect the views of the original submitter only.